ClickHouse/tests/testflows/example/requirements/CH_SRS001_ClickHouse.md
Alexey Milovidov e9e77b4403 .tech -> .com
2021-09-22 03:22:57 +03:00

3.8 KiB

SRS-001 ClickHouse Software Requirements Specification Template

Author: [name of the author]

Date: [date]

Table of Contents

Revision History

This document is stored in an electronic form using Git source control management software.

Introduction

This section provides an introduction to the project or the feature. All SRS documents must be uniquely identified by a number. In this case this document is identified by the number

SRS-001

The document number must always be used as a prefix to the document title. For example,

SRS-xxx Name of the document

All the requirements must be specified in the Requirements section.

Table of Contents

Note that currently the table of contents is generated manually using

cat CH_SRS001_ClickHouse.md | tfs document toc

command and needs to be updated any time requirement name is changed or a new requirement is added.

Generating HTML version

You can easily generate a pretty HTML version of this document using the command.

cat CH_SRS001_ClickHouse.md | tfs document convert > CH_SRS001_ClickHouse.html

Generating Python Requirements

You can convert this SRS into the requirements.py by using the command.

cat CH_SRS001_ClickHouse.md | tfs requirements generate > requirements.py

Terminology

You can define terminolgy using the examples below and you can make them linkable as SRS by defining the links in the References section.

SRS

Software Requirements Specification

Some term that you will use

Some description of the term that you would like to use.

Requirements

This section includes all the requirements. This section can be structured in any way one sees fit.

Each requirement is defined by the section that starts with the following prefix:

RQ.[document id].[requirement name]

then immediately followed by a one-line block that contains the the version of the requirement.

RQ.SRS-001.Example

version: 1.0

This is a long description of the requirement that can include any relevant information.

The one-line block that follows the requirement defines the version of the requirement. The version is controlled manually and is used to indicate material changes to the requirement that would require tests that cover this requirement to be updated.

It is a good practice to use requirement names that are broken up into groups. It is not recommended to use only numbers because if the requirement must be moved the numbering will not match. Therefore, the requirement name should start with the group name which is then followed by a number if any. For example,

RQ.SRS-001.Group.Subgroup.1

To keep names short, try to use abbreviations for the requirement's group name.

RQ.SRS-001.Example.Subgroup

version: 1.0

This an example of a sub-requirement of the RQ.SRS-001.Example.

RQ.SRS-001.Example.Select.1

version: 1.0

ClickHouse SHALL return 1 when user executes query

SELECT 1

References